Fujitsu Eternus DX90 S2 Instalasi Perangkat Keras - Halaman 6

Jelajahi secara online atau unduh pdf Instalasi Perangkat Keras untuk Penyimpanan Fujitsu Eternus DX90 S2. Fujitsu Eternus DX90 S2 23 halaman. Server connection. (fibre channel) for aix
Juga untuk Fujitsu Eternus DX90 S2: Panduan Pengguna (35 halaman), Panduan Pengguna (42 halaman), Manual (18 halaman), Instal Pengaturan (20 halaman), Konfigurasi Manual Koneksi Server (13 halaman), Panduan Konfigurasi (28 halaman), Panduan Konfigurasi (15 halaman), Panduan Konfigurasi (38 halaman)

Fujitsu Eternus DX90 S2 Instalasi Perangkat Keras
Rack Mounting (2)
Attach the 2U Bracket to the right rear
rack pillar
The M5 centering screws should be
inserted in the 1st and 6th holes
above the base line of the
Enclosures
Insert the pins of the left hand
side slide rail in the 1st and
3rd hole
Start counting from the bottom
of the 2U Bracket
Hardware Installation
ETERNUS DX80 S2 and DX90 S2
2U Bracket
Base line of the
Controller Enclosure
5
Copyright Fujitsu Technology Solutions, Release August 2011
M5 Centering
screws (10 mm)