Fujitsu Eternus DX90 S2 Hardware Installation - Page 6

Browse online or download pdf Hardware Installation for Storage Fujitsu Eternus DX90 S2. Fujitsu Eternus DX90 S2 23 pages. Server connection. (fibre channel) for aix
Also for Fujitsu Eternus DX90 S2: User Manual (35 pages), User Manual (42 pages), Manual (18 pages), Instal Setup (20 pages), Configuration Manual Server Connection (13 pages), Configuration Manual (28 pages), Configuration Manual (15 pages), Configuration Manual (38 pages)

Fujitsu Eternus DX90 S2 Hardware Installation
Rack Mounting (2)
Attach the 2U Bracket to the right rear
rack pillar
The M5 centering screws should be
inserted in the 1st and 6th holes
above the base line of the
Enclosures
Insert the pins of the left hand
side slide rail in the 1st and
3rd hole
Start counting from the bottom
of the 2U Bracket
Hardware Installation
ETERNUS DX80 S2 and DX90 S2
2U Bracket
Base line of the
Controller Enclosure
5
Copyright Fujitsu Technology Solutions, Release August 2011
M5 Centering
screws (10 mm)