Kohler K-1112P Panduan Instalasi - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bak mandi Kohler K-1112P. Kohler K-1112P 48 halaman. Bath with airjets and integral apron canada
Juga untuk Kohler K-1112P: Panduan Instalasi (48 halaman)

Kohler K-1112P Panduan Instalasi

1. Prepare the Site

NOTICE: Do not support the bath by the rim.
NOTICE: Refer to the Roughing-in Guide packed with this product for proper minimum lbs/square foot
(kg/square meter) floor support loading.
NOTICE: Provide adequate ventilation and a minimum of 15 cubic feet (.4 cubic meters) in the installed
location for cooling the motor and to supply sufficient air for the blower. Do not install the blower motor
closer than 1" (2.5 cm) from the wall or other objects.
Make sure the floor offers adequate support for your bath, and verify that the subfloor is flat and
level.
Construct 2x4 or 2x6 stud framing designed for your particular installation.
Install an access panel to allow the blower motor to be serviced.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.
1040293-2-E
Showerhead
Blocking
Supply
Valves
Spout
Header
Over
Opening
Remove
bottom plate.
6
Kohler Co.