Kohler K-1151 Panduan Instalasi - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bak mandi Kohler K-1151. Kohler K-1151 48 halaman. Bath with airjets
Juga untuk Kohler K-1151: Panduan Pemilik Rumah (29 halaman), Panduan Pemilik Rumah (36 halaman), Panduan Pemilik Rumah (32 halaman), Panduan Pemilik Rumah (36 halaman), Panduan Instalasi (36 halaman), Manual Pengasahan Awal (Roughing-In) (4 halaman), Panduan Instalasi (48 halaman), Panduan Pemilik Rumah (29 halaman)

Kohler K-1151 Panduan Instalasi

Thank You For Choosing Kohler Company

We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before
you start your installation. If you encounter any installation or performance problems, please don't hesitate
to contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing
Kohler Company.

Tools and Materials

Silicone Sealant
Measuring Tape
Safety Glasses
Pipe Wrench

Before You Begin

CAUTION: Risk of product damage. Do not lift the bath with airjets by the piping or blower motor, or
use the piping or blower motor for structural support of the bath.
CAUTION: Risk of product damage. Do not lift the bath with airjets by the integral apron.
We recommend this bath with airjets for alcove installation.
Please read these instructions carefully to familiarize yourself with the required tools, material, and
installation sequences. Follow the sections that pertain to your particular installation. This will help
you avoid costly mistakes. In addition to installation instructions, read all operating and safety
instructions.
Inspect the bath with airjets for damage before you begin installation.
You must install this bath to an adequately supported, level subfloor.
Confirm adequate mounting and connection space for the faucet specified for your installation.
An optional accessories kit is available for relocating the blower motor. Refer to the back cover for
contact information if this kit is desired but was not ordered. If relocating the blower motor, follow
the instructions that came with the kit while performing this installation.
1040292-2-C
Claw
Pencil
Hammer
Blade
Level
Screwdriver
4
Plus:
• Conventional woodworking tools
and materials
• Drop Cloth
• Construction adhesive (optional)
• Cement or mortar (optional)
• #6 Large-head Galvanized Nails
• 2x4's or 2x6's
Kohler Co.