Aqua Creek F-044SCH-04 Petunjuk Manual - Halaman 2

Jelajahi secara online atau unduh pdf Petunjuk Manual untuk Pengisi Daya Baterai Aqua Creek F-044SCH-04. Aqua Creek F-044SCH-04 9 halaman. 24v solar charger for use with admiral, ranger 2, ambassador

Aqua Creek F-044SCH-04 Petunjuk Manual
Admiral & Ranger 2 Installation
ADMIRAL OR
RANGER 2 LIFT
REMOVE THIS
1/2" HEX BOLT
To install the Solar Charger on a Admiral or Ranger 2 lift;
STEP 1: Remove the 1/2" hex bolt from the baseplate as shown above.
STEP 2: Place the 24V Solar Charger over the baseplate of the lift as shown.
STEP 3: Align the mounting stud with the baseplate & anchor insert. Thread the mounting stud into the
anchor insert and tighten. Use a 3/4" wrench to make sure it is snug.
STEP 4: The solar charger control box connector plugs directly into the battery and control box on the
lift. See page 4 for Admiral lift and page 5 for Ranger 2 lift.
2
Copyright © 2020 Aqua Creek Products All Rights Reserved
CHARGE
CONNECTOR
PLUGS INTO
CONTROL BOX
THREAD INTO
ANCHOR INSERT
TIGHTEN WITH
3/4" WRENCH
Revised 3/18/20