ensto eFiller Manual Petunjuk Pengoperasian - Halaman 5
Jelajahi secara online atau unduh pdf Manual Petunjuk Pengoperasian untuk Pengisi Daya Baterai ensto eFiller. ensto eFiller 12 halaman.
3.3 Supply Connection
The supply cable routing must be proper. Ensure the sufficient supply cable sizes in the instal-
lation. No additional loads in the same supply line.
See figure 2.
•
Pull the supply cable through the cable lead through plate 350mm - 400mm measured
from the lead through.
•
Remove the sheath of the supply cable at the length of max. 250mm.
•
Cut the leads in different lengths so that the PE cable is the longest and strip them at the
length of 23mm.
•
Connect the supply cable leads to the supply connectors according to the connection dia-
gram. Ensure strain relief to the cables by fastening it on the cable support that is located
under the supply connectors.
IMPORTANT NOTICE: eFiller needs to be installed to a dedicated supply line, which is equipped
with 30mA residual current device (RCD-B) and 16A circuit breaker (MCB).
Figure 2
RAK130_ENG / © Ensto 2018
5