Allied Telesis AT-8900 SERIES Panduan Pemasangan Cepat - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Pemasangan Cepat untuk Perangkat lunak Allied Telesis AT-8900 SERIES. Allied Telesis AT-8900 SERIES 13 halaman. How to set up pppoe between a linux client and access concentrator
Juga untuk Allied Telesis AT-8900 SERIES: Pemecahan masalah (5 halaman), Bagaimana-Cara (8 halaman)
Quick Install Guide
C613-04048-01 REV B
To install the switch using the wall-mount kit:
•
Ensure that there is sufficient space on the wall for the switch and its
associated cables.
Note that the wall-mount kit is designed to hold the switch against the
wall with the front and back of the switch vertical.
•
Remove the rubber feet from the switch.
•
Screw the brackets to the sides of the switch using the supplied M4
screws (see Figure 2).
•
Locate the position on the wall where the switch will be mounted.
•
Locate and mark the position on the wall where the top wall-mount
brackets will be fixed.
The top wall-mount brackets are fixed to the wall through the wall
anchor slot (see Figure 2).
Make sure that the positions you have marked on the wall are the
correct distance apart and are horizontal.
•
Fix two wall anchors in the wall, one for each bracket.
•
Hang the switch from these anchors.
Fix additional wall anchors through the bottom wall-mount brackets, 2
per bracket.
•
Ensure that all wall anchors are tightened sufficiently to secure the
switch firmly against the wall.
Figure 2: Fitting wall-mount brackets on the switch
Bracket
A
B
A
B
Bracket
A
Switch
Key:
A
screw
B
wall anchor slot
7
A
8900WM