Dell PowerEdge 2900 Manual - Halaman 19

Jelajahi secara online atau unduh pdf Manual untuk Server Dell PowerEdge 2900. Dell PowerEdge 2900 26 halaman. Tower-to-rack conversion guide
Juga untuk Dell PowerEdge 2900: Informasi Instalasi (11 halaman), Panduan Instalasi (14 halaman), Panduan Instalasi (10 halaman), Memperbarui (2 halaman)

Dell PowerEdge 2900 Manual

Installing the Control Panel Assembly

1 Install the control panel assembly.
Insert the display module into the front panel cutout and secure with the two M3 x 12 T10 Torx
a
panhead screws.
NOTICE: Do not over-tighten the screws.
Locate the replacement label for the front of the display, remove the liner from the adhesive
b
backing on the label, and apply the label to the front of the display module.
Install the control panel board in the system chassis directly behind the display module and
c
secure with the three M3 x 5 T10 Torx panhead screws. See Figure 1-7.
NOTICE: Do not over-tighten the screws.
Reroute the control panel interface cable back into the interior of the system chassis, and
d
connect the control panel interface cable to the control panel board. See Figure 1-7.
Connect the display module cable to the connector on the control panel board. See Figure 1-7.
e
Ensure that the cable is fully seated before you press the locking ring into position.
2 Install the metal filler panel into the chassis cutout where the control panel cable formerly routed. See
Figure 1-6.
3 Reinstall the hard-drive carriers, drive blanks, and filler panels into their respective drive bays.
NOTE:
Ensure that the hard drives, any optical drives, and devices are reinstalled into the same positions
from which they were removed. The devices should be labeled appropriately.
Tower-to-Rack Conversion Guide
17