Dell PowerEdge 2900 매뉴얼 - 페이지 19
{카테고리_이름} Dell PowerEdge 2900에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell PowerEdge 2900 26 페이지. Tower-to-rack conversion guide
Dell PowerEdge 2900에 대해서도 마찬가지입니다: 설치 정보 (11 페이지), 설치 매뉴얼 (14 페이지), 설치 매뉴얼 (10 페이지), 업데이트 (2 페이지)
Installing the Control Panel Assembly
1 Install the control panel assembly.
Insert the display module into the front panel cutout and secure with the two M3 x 12 T10 Torx
a
panhead screws.
NOTICE: Do not over-tighten the screws.
Locate the replacement label for the front of the display, remove the liner from the adhesive
b
backing on the label, and apply the label to the front of the display module.
Install the control panel board in the system chassis directly behind the display module and
c
secure with the three M3 x 5 T10 Torx panhead screws. See Figure 1-7.
NOTICE: Do not over-tighten the screws.
Reroute the control panel interface cable back into the interior of the system chassis, and
d
connect the control panel interface cable to the control panel board. See Figure 1-7.
Connect the display module cable to the connector on the control panel board. See Figure 1-7.
e
Ensure that the cable is fully seated before you press the locking ring into position.
2 Install the metal filler panel into the chassis cutout where the control panel cable formerly routed. See
Figure 1-6.
3 Reinstall the hard-drive carriers, drive blanks, and filler panels into their respective drive bays.
NOTE:
Ensure that the hard drives, any optical drives, and devices are reinstalled into the same positions
from which they were removed. The devices should be labeled appropriately.
Tower-to-Rack Conversion Guide
17