EarthLinked HCM-1860C Panduan Instalasi dan Pemeliharaan - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Instalasi dan Pemeliharaan untuk Pendingin Udara EarthLinked HCM-1860C. EarthLinked HCM-1860C 13 halaman. Hybrid cooling module
Installation - Placement
The Hybrid Cooling Module unit is placed as shown in Figure 2 relative to other components in
®
the EarthLinked
system. The Hybrid Cooling Module is located outdoors and will be
connected to the refrigerant line set (vapor tube) outside the building.
Figure 2. Hybrid Cooling Module Placement in EarthLinked
NOTES:
All refrigerant and water lines between these above ground components must be
insulated with at least 1/2" wall thickness Armaflex, Insul-Tube or equivalent
insulation. Thicker insulation is recommended for the Compressor Unit-to-Air Handler
refrigeration lines for sound isolation
If you plan to exceed the 40 ft. max elevation of the Air Handler, please contact our
Tech Support Department. Increased height will reduce performance and shall be
factored into system sizing
The Hydronic Water Module (HWM) shall always be mounted above the Compressor
Unit, never below.
HCM-IMM (10/16)
®
System
6