Before installing the device, verify that the site selected for the device meets the following site
requirements:
•
Power — The device is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 220/110
VAC, 50/60 Hz.
•
General — Ensure that the power supply is correctly installed.
•
Clearance — There is adequate frontal clearance for operator access. Allow clearance for cabling,
power connections, and ventilation.
•
Cabling — Cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast
amplifiers, power lines, and fluorescent lighting fixtures.
•
Ambient Requirements — The ambient device operating temperature range is 0 to 45 °C (32 to
113 °F) at a relative humidity of up to 95%, non-condensing. Verify that water or moisture cannot
enter the device case.
Unpacking
Package Contents
While unpacking the device, ensure that the following items are included:
•
The device
•
AC power cable
•
Self-adhesive rubber pads (for on-shelf installation)
•
Rack-mount kit for installation
•
Documentation CD
•
Product Information Guide
Unpacking the Device
To unpack the PowerConnect device:
NOTE:
Before unpacking the device, inspect the packaging and report any evidence of damage.
1 Place the box on a clean flat surface.
2 Open the box or remove the box top.
3 Carefully remove the device from the package and place it on a secure, stable and clean surface.
4 Remove all packing material.
5 Inspect the product for damage. Report any damage immediately.
6
Installation