Dell PowerConnect 28 SERIES Aan de slag handleiding - Pagina 6

Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Dell PowerConnect 28 SERIES. Dell PowerConnect 28 SERIES 22 pagina's.

Dell PowerConnect 28 SERIES Aan de slag handleiding
Before installing the device, verify that the site selected for the device meets the following site
requirements:
Power — The device is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 220/110
VAC, 50/60 Hz.
General — Ensure that the power supply is correctly installed.
Clearance — There is adequate frontal clearance for operator access. Allow clearance for cabling,
power connections, and ventilation.
Cabling — Cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast
amplifiers, power lines, and fluorescent lighting fixtures.
Ambient Requirements — The ambient device operating temperature range is 0 to 45 °C (32 to
113 °F) at a relative humidity of up to 95%, non-condensing. Verify that water or moisture cannot
enter the device case.

Unpacking

Package Contents

While unpacking the device, ensure that the following items are included:
The device
AC power cable
Self-adhesive rubber pads (for on-shelf installation)
Rack-mount kit for installation
Documentation CD
Product Information Guide

Unpacking the Device

To unpack the PowerConnect device:
NOTE:
Before unpacking the device, inspect the packaging and report any evidence of damage.
1 Place the box on a clean flat surface.
2 Open the box or remove the box top.
3 Carefully remove the device from the package and place it on a secure, stable and clean surface.
4 Remove all packing material.
5 Inspect the product for damage. Report any damage immediately.
6
Installation