360 Yield 360 Y-DROP JOHN DEERE 4930 Buku Petunjuk - Halaman 7

Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Peralatan Pertanian 360 Yield 360 Y-DROP JOHN DEERE 4930. 360 Yield 360 Y-DROP JOHN DEERE 4930 11 halaman.

INSTALL YOKE ASSEMBLIES
V.
ON THE OEM PRIMARY BOOM
Figures 13 and 14
Step 1
With the U-bolt pointing to the rear,
install the yoke mount (1) and flange
nuts to upper boom section.
Step 2
With the square U-bolt threads pointing
up and using the extra thick washer and
Nylock nut, install yoke mount (2) to the
360 Y-DROP boom section.
Step 3
Using pins, install the yoke straps (3)
between the upper boom and 360
Y-DROP boom. Using the flange nuts,
tighten the 1-1/4" carriage bolts.
Repeat Steps 1-3 for the remaining yokes on
the OEM primary booms. Yokes should be spaced
approximately 60" (±5") apart.
NOTE: A 4" x 3/8" thick plate has been provided to
be used as a spacer and should be installed between
the OEM boom and the upper yoke mount if needed.
INSTRUCTIONS 360 Y-DROP
Figure 13
Figure 14
360YIELDCENTER.COM
JOHN DEERE 4930/4940
2
1
3
2
7