Miele DDF 125 Panduan Pengoperasian dan Instalasi - Halaman 19
Jelajahi secara online atau unduh pdf Panduan Pengoperasian dan Instalasi untuk Kap Ventilasi Miele DDF 125. Miele DDF 125 24 halaman. External motor roof installation
Juga untuk Miele DDF 125: Petunjuk Pengoperasian dan Pemasangan (28 halaman), Panduan Petunjuk Instalasi (28 halaman)
DDF 125/150
* Lead flashing
The roof vent kit can be used for
installing venting through pitched tiled,
pantiled, slate or shingle roofs.
Consult a roof tiler for advice regarding
other types of roofing.
The roof vent kit is not suitable for
flat roofs.
Installation must only be carried out
by a qualified roof tiler.
^ Remove the roofing around the
installation area.
^ Bend the flashing upwards.
^ Position the vent kit on the roof with
the air outlet directed down the roof.
^ Secure the vent kit to the roof
substructure with the fixing plate.
^ Replace the roofing. Press down on
the flashing to ensure that it creates a
proper seal.
The flashing should be fitted under
the roofing at the top and above the
roofing at the sides and the bottom.
The vent kit stub has a diameter of
125 mm when the appliance is
supplied.
^ If a diameter of 150 mm is required,
the front ring of the stub must be cut
off at the join with a sharp knife (see
illustration).
^ Push the flexible ducting onto the stub
and secure it with a hose clip.
It has an integrated non-return flap.
Installation
19