Miller Axcess 300 Panduan Pemilik - Halaman 18

Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Sistem Pengelasan Miller Axcess 300. Miller Axcess 300 44 halaman. Arc welding power source and wire feeder with meters
Juga untuk Miller Axcess 300: Panduan Pemilik (36 halaman), Panduan Pemilik (48 halaman)

Miller Axcess 300 Panduan Pemilik
3-12. Selecting a Location and Connecting Input Power (Linking For 200/230/460 Volts
Model Only)
18 in (457 mm)
for airflow
Have only qualified persons make this installation.
1
Rating Label
Check input voltage available at site.
Remove wrapper.
2
Jumper Link Label
OM-1321 Page 14
Tools Needed:
200 VOLTS
2
3/8 in
3/8 in
GND/PE
Connect First
1
Size and ratings must comply with applicable
codes (see Section 3-11). Install conductors in
conduit or equivalent into a deenergized line
disconnect device.
Do not overtighten
jumper link nuts.
230 VOLTS
3
Jumper Links
Move jumper links to match input voltage.
Reinstall wrapper.
Y Special installation may be required where gasoline or
volatile liquids are present − see NEC Article 511 or
CEC Section 20.
GND/PE
L1
L2
L3
3
460 VOLTS
Ref.
S-072 135-B
Ref. 801 768-C