HP StorageWorks director 2/140 Panduan Petunjuk Instalasi - Halaman 16
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Beralih HP StorageWorks director 2/140. HP StorageWorks director 2/140 24 halaman. Universal port module kit
Juga untuk HP StorageWorks director 2/140: Panduan Petunjuk Instalasi (22 halaman)
![HP StorageWorks director 2/140 Panduan Petunjuk Instalasi](/uploads/products/server2/3836621/3836621.png)
Installation Instructions
Installation
1. Follow ESD procedures by attaching a wrist strap to the director chassis.
CAUTION: To avoid causing machine errors or damage while working on the director,
follow ESD procedures by connecting a grounding cable to the director chassis and
wearing an ESD wrist strap.
CAUTION: Ensure that protective plugs are inserted into the UPM card optical
transceiver receptacles. This prevents damage to sensitive components and prevents
injury to the eye if the laser is viewed directly.
2
1
UPM Card
Figure 6: Director 2/64 UPM card installation
8
1
St or ag eW
St or ag eW
or ks SA
or ks SA
N 60 64
N 60 64
2
Torque Tool
universal port module kit installation instructions
SHR-2302