HP StorageWorks director 2/140 설치 지침 매뉴얼 - 페이지 16

{카테고리_이름} HP StorageWorks director 2/140에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HP StorageWorks director 2/140 24 페이지. Universal port module kit
HP StorageWorks director 2/140에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (22 페이지)

HP StorageWorks director 2/140 설치 지침 매뉴얼
Installation Instructions

Installation

1. Follow ESD procedures by attaching a wrist strap to the director chassis.
CAUTION: To avoid causing machine errors or damage while working on the director,
follow ESD procedures by connecting a grounding cable to the director chassis and
wearing an ESD wrist strap.
CAUTION: Ensure that protective plugs are inserted into the UPM card optical
transceiver receptacles. This prevents damage to sensitive components and prevents
injury to the eye if the laser is viewed directly.
2
1
UPM Card
Figure 6: Director 2/64 UPM card installation
8
1
St or ag eW
St or ag eW
or ks SA
or ks SA
N 60 64
N 60 64
2
Torque Tool
universal port module kit installation instructions
SHR-2302