Dickinson Newport - P9000 Panduan Instalasi dan Pengoperasian - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Instalasi dan Pengoperasian untuk Perapian Dalam Ruangan Dickinson Newport - P9000. Dickinson Newport - P9000 12 halaman. Propane fireplace/heater
DIRECT VENT STAINLESS STEEL FLEX PIPE
Four springs are installed between the inside and outside pipe to ensure that an even air space is
provided. IT IS IMPORTANT THAT TWO SPRINGS BE LOCATED AT ANY BEND IN
ORDER TO PREVENT THE PIPES FROM TOUCHING.
approximately 28" (70cm).
Bending the pipe will cause the pipe to stretch. The pipe can be cut with a fine hacksaw blade to
the required length.
unraveling and the diameter increasing.
The pipe is lubricated during the manufacture process. This lubricant will burn off on the first
firing of the heater.
Additional 28" (70cm) lengths of pipe are sold as an option ( Part No. 19-000). This pipe can be
cut with a fine hacksaw blade to the required length. A coupling fitting is provided with the
optional length.
DIRECT VENT THRU-FITTING AND CAP
Deck Flange
Screw Pilot Holes
Deck
4 Mounting Screws
INSTALLATION PROCEDURE
Step - 1 Cut a 3" hole through the deck, ceiling or wall.
Step - 2
www.ahoycaptain.com
The pipe can be stretched to provide several additional inches.
Tape the end of the pipe while cutting to prevent the pipe from
Make sure the sealing gasket is installed under the above deck-flange before
screwing down the fitting.
the boat, so that it is not visible.
secure with the 6 S/S screws supplied.
o
6" (15cm)
3" (75mm)
Flexible Double Pipe
Rotate the fitting to position the pipe seam, inside
Holding the deck flange firmly in position
The length of pipe supplied is
6 Mounting Screws
Sealing Gasket
Dress Ring
6