Safety
Switch the 230V mains supply off by removing the relevant
fuse or switching off the relevant MCB prior to beginning the
installation.
A minimum conductor size of 2.5mm
must be used to supply
2
the Boost Timer.
Ensure the correct sized cable is used to connect the Boost
Timer to the relevant appliance to be switched.
For 3 kW loads, a minimum cable size of 1.5mm
should be used.
2
As per diagram on page 6 and 7.
Connect the mains supply cables to the correct terminals;
L in, N in and Earth.
Connect the load cables to the correct terminals, L out, N out
and Earth.
9
Boost Timer Pro