AXITEC AXIhycon 5H Panduan Memulai Cepat - Halaman 2
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Inverter AXITEC AXIhycon 5H. AXITEC AXIhycon 5H 8 halaman.
WARNING:
Please be aware that this is a quick guide. It is absolutely essential to carefully read and follow the
complete instructions to ensure proper setup.
1.
PREPARATION FOR STARTUP
-
Ensure accessibility to all devices.
-
Check the installation and ventilation of the inverter.
-
Ensure the top of the inverter is free of obstacles.
-
Lay cables in a protected manner.
-
Connect the Bluetooth antenna.
2.
DOWNLOADING THE APP
1. Visit www.soliscloud.com and download the app.
2. Search for "SolisCloud" on the Google Play Store or App Store.
3. Scan the QR code to download "SolisCloud."
3.
CONNECTORS
Connector
Used for CAN communication between inverter and lithium battery BMS.
BMS
Is employed for RS485 communication between the inverter and the smart meter. This is necessary to
Meter
implement normal hybrid control logic.
(Optional) Utilized for Modbus RTU communication with external devices or third-party controls.
RS485
(Optional) In the context of implementing demand response or logic interface functions, this feature may
DRM
be required in the UK and Australia.
(Optional) Communication ports for parallel operation (reserved).
P-A/P-B
(Optional) Connection for potential-free contact (reserved).
DO/DI
-
Connect the AC power supply.
-
Connect additional communication ports (BMS, meter, RS485, DRM, P-A/P-B, DO/DI) as needed.
AXIhycon-EN231024
Function
1