ABB SACE Emax 2 Manual Perkuatan - Halaman 6

Jelajahi secara online atau unduh pdf Manual Perkuatan untuk Alat Ukur ABB SACE Emax 2. ABB SACE Emax 2 10 halaman. With aeg me1257-me2007-me2507-me3207 plug-in air circuit-breakers
Juga untuk ABB SACE Emax 2: Manual (5 halaman), Manual (7 halaman), Manual (6 halaman), Manual (6 halaman), Manual (5 halaman), Manual (4 halaman), Manual (4 halaman), Manual (6 halaman), Manual (4 halaman), Manual (7 halaman), Manual (6 halaman), Panduan Pengguna (10 halaman), Manual (15 halaman), Manual (4 halaman), Manual (6 halaman), Manual (5 halaman), Manual (15 halaman), Manual (4 halaman), Manual (12 halaman), Petunjuk Pemasangan (20 halaman), Manual (18 halaman), Panduan Pemilik (20 halaman), Manual (16 halaman), Panduan Memulai Cepat (7 halaman), Pemasangan (8 halaman), Manual (11 halaman), Penggantian (16 halaman), Manual (14 halaman), Manual (13 halaman), Panduan Pengguna (14 halaman), Panduan Memulai Cepat (5 halaman), Panduan Pengoperasian Awal (8 halaman), Manual (4 halaman), Manual (9 halaman), Manual Perkuatan (16 halaman), Manual (11 halaman)

ABB SACE Emax 2 Manual Perkuatan
MAKING THE SYSTEM SAFE FOR INSTALLATION
The following warnings and precautions must be respected before installing the new cradle and circuit breaker in
the switchgear.
Ÿ Place the switchgear housing and the legacy circuit breaker out of service.
Ÿ Disconnect the power from the switchgear (power circuit and auxiliary circuits) and verify it is disconnected
from all sources of energy.
Ÿ Set the legacy circuit breaker to the open position with the springs unloaded.
Ÿ Double check to ensure that the line has been placed out of service.
NOTE: The trained personnel in charge of handling and lifting must use appropriate safety equipment.
DB-50
Tools Required:
1
Remove the legacy OEM circuit breaker
Ÿ Open the door of the switchgear.
Ÿ Refer to the OEM installation manual for instructions to
remove the breaker from service.
Ÿ Rack out the breaker using the DB rack out leverage
tool (fig. 1).
WARNING: THE CIRCUIT BREAKER COULD DROP WHEN
LIFTING. FASTEN IT TO A LIFTING TRUCK BEFORE
PROCEEDING.
Ÿ Extract the circuit breaker according to the procedures in
the OEM installation manual (fig. 2).
Ÿ Disconnect and remove any auxiliary signaling devices that
will not be used with the new Emax 2 CiC adapter.
Ÿ Remove all the tools and equipment used for the extraction
and clean off the processing residues and metal scraps.
DB BREAKER
A
Allen Key (5mm)
B
Fig. 1
Fig. 2