Shimano BB-MT801 Panduan Dealer - Halaman 19
Jelajahi secara online atau unduh pdf Panduan Dealer untuk Aksesori Sepeda Shimano BB-MT801. Shimano BB-MT801 24 halaman.
Juga untuk Shimano BB-MT801: Manual (26 halaman)
MAINTENANCE
Replacing chainrings
MAINTENANCE
Replacing chainrings
Installation of the chain guard
Attach the chain guard to the largest chainring as shown in the illustration.
The marked side of the largest chainring should face outward.
Position the chain guard so that the flat areas align with the holes in the largest chainring.
(A)
(B)
19
(A)
Marking
(B)
Flat areas
Tightening torque
1.5 - 2 N·m