Shimano BB-MT801 딜러 매뉴얼 - 페이지 19

{카테고리_이름} Shimano BB-MT801에 대한 딜러 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Shimano BB-MT801 24 페이지.
Shimano BB-MT801에 대해서도 마찬가지입니다: 매뉴얼 (26 페이지)

Shimano BB-MT801 딜러 매뉴얼
MAINTENANCE

Replacing chainrings

MAINTENANCE
„ Replacing chainrings
Installation of the chain guard
Attach the chain guard to the largest chainring as shown in the illustration.
The marked side of the largest chainring should face outward.
Position the chain guard so that the flat areas align with the holes in the largest chainring.
(A)
(B)
19
(A)
Marking
(B)
Flat areas
Tightening torque
1.5 - 2 N·m