Siemens SIMATIC S7-200 Manual - Halaman 22
Jelajahi secara online atau unduh pdf Manual untuk Peralatan Industri Siemens SIMATIC S7-200. Siemens SIMATIC S7-200 35 halaman. Ethernet gateway for simatic mpi/ profibus driver
Juga untuk Siemens SIMATIC S7-200: Manual (30 halaman), Panduan Pengemudi (28 halaman), Manual (49 halaman), Manual (18 halaman), Manual Sistem (20 halaman)
Micro Automation Set 14
5.
Ensure that the configuration PC is
connected to S7-300 "Backup" via
SCALANCE X108. Load the program to
the S7-300 CPU. When configuring the
S7-300 CPU for the first time, it is
required to select the connection partner
using the MAC address.
6.
Connect S7-300 "Backup" to S7-200
"Basis" via SCALANCE X108.
7.
Restart S7-200 "Basis".
Configuring S7-400 "Backup" station with STEP 7 project
Table 5-6
No.
1.
Connect the S7-400 PS to an AC 230 V
supply voltage.
2.
Switch on the power supply.
3.
Open the included S7-400 project
"Set14_S7-400_V2-0.zip" on the
configuration PC using STEP 7 and make
the following settings in STEP 7:
• Set the access point in "Set PG/PC
Interface" to "STEP7
network controller"
V2.0
Entry ID 21062588
Function
TCP/IP(Auto)
05/18/05
Configuration PC
IE cable
CPU 315 PN/DP
IE cable
"
S7-300
Backup"
IE cable
S7-200
"
Basis"
IE cable
Comment
Live Demo
SCALANCE X108
SCALANCE X108
22/35