Siemens SIWAREX WL230 BB-S SA Panduan Petunjuk Pengoperasian - Halaman 25
Jelajahi secara online atau unduh pdf Panduan Petunjuk Pengoperasian untuk Peralatan Industri Siemens SIWAREX WL230 BB-S SA. Siemens SIWAREX WL230 BB-S SA 44 halaman. Base plate and elastomer bearing bb-s sa
Juga untuk Siemens SIWAREX WL230 BB-S SA: Manual (36 halaman), Panduan Petunjuk Pengoperasian (48 halaman), Panduan Peralatan (50 halaman)
4.2.7
Set overload protection
Procedure
1. Load the load bearing implements with the maximum occurring load.
2. Set the overload protection with the nut to 0.05 to 0.1 mm
The dimension 0.05 to 0.1 mm
4.2.8
Compensation of height with four or more support points
Introduction
Check during the installation whether compensation of the height on the brackets is necessary
and meaningful.
Compensation of the height does not make any sense when the load bearing implement and/
or the foundation are elastic. With a rigid load bearing implement and rigid foundation, a bearing
with four or more points is considered as statically undefined. In such cases it is meaningful to
check the load on the individual load cells.
Compensation of the height is necessary in the following cases:
● A load cell is not loaded.
● Two diagonally opposite load cells are overloaded by a full scale.
BB-S SA
Operating Instructions, 03/2020, A5E47358100-AA
4.2 Installing the base plate and elastomer bearing
①
must remain the same even after locking the nut.
Installation
①
.
25