Cisco 8540 - Catalyst Campus Switch Router Modular Expansion Base Panduan Pemecahan Masalah - Halaman 19

Jelajahi secara online atau unduh pdf Panduan Pemecahan Masalah untuk Perangkat Keras Jaringan Cisco 8540 - Catalyst Campus Switch Router Modular Expansion Base. Cisco 8540 - Catalyst Campus Switch Router Modular Expansion Base 23 halaman. Installing the controller
Juga untuk Cisco 8540 - Catalyst Campus Switch Router Modular Expansion Base: Manual (11 halaman)

Cisco 8540 - Catalyst Campus Switch Router Modular Expansion Base Panduan Pemecahan Masalah

My management port not coming up

Solution
Note that the port numbering starts from right to left.
Note

Not able to install/update 5520 controller software

Solution
Check if you have downloaded the 5520 software . 5508 software is not compatible with 5520
https://software.cisco.com/download/release.html?mdfid=286284738&flowid=74382&softwareid=280
926587&release=8.1.102.0&relind=AVAILABLE&rellifecycle=ED&reltype=latest

Not able to detect the 1G SFP

Solution
If there is nothing installed in port 1, the board will be configured for 10 G mode by default. Therefore,
to switch to 1 G mode, install an SFP module in port 1 and the reboot the system.
Conversely, if an SFP module is installed and the user wants to switch to 4 x 10 G mode, then an SFP+
module must be installed in port 1 and the WLC has to be rebooted.
Thus, Online Insertion and Removal (OIR) of SFP and SFP+ between 10 G and 1 G is not possible.
OIR of 10 G to 10 G and 1 G and 1 G is possible.
Note for 1 G SFP to be detected make sure it is MSA compliant.
Verify if the correct port is connected
Cisco 5520 and 8540 Wireless Controller Troubleshooting Guide
Troubleshooting
19