Cisco SCE 1000 and Panduan Memulai Cepat - Halaman 3
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Perangkat Keras Jaringan Cisco SCE 1000 and. Cisco SCE 1000 and 49 halaman. Service control engine 1000 2xgbe
• Grounding kit (shipped with the SCE 1000)
• 12 AWG or 2.5 mm copper installation wire with hex or loop connectors for DC power leads (DC power only) Ring
terminals must be UL approved and suitable for 12 AWG wire.
• AC power cords (AC power only, shipped with SCE 1000)
• Rack-mounting kit (shipped with SCE 1000)
Spare screws for changing bracket position
–
Prepare for Rack-Mount Installation
Before you begin the rack-mounting tasks, determine the type of rack—four-post or two-post—that you will be using.
Workbench or Tabletop Installation
Figure 1
Tabletop Installation of the SCE 1000 Platform
BYP ASS
STA TUS
TX
PW R B
LIN K RX
PW R A
RX
TX
MM
RX
GBE -1
LIN E
AU X
SUB
LE
CO NSO
MN G 2
MN G 1
10/1 00/
LINK /
LINK /
10/1 00/
ACT IVE
1000
1000
ACT IVE
1
2
For a workbench or tabletop installation, verify the following before installing the SCE 1000 platform:
• The SCE 1000 platform is off the floor and has adequate ventilation.
• An adequate chassis ground (earth) connection exists for the SCE 1000 platform.
• The SCE 1000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches (12.7 cm) of clearance at
the rear to allow proper air flow.
Remove the adhesive strips from the four rubber feet and affix the feet onto the four marked locations on the bottom
Step 1
panel of the unit.
Step 2
Place the SCE 1000 platform on the tabletop or workbench.
Se rie s
0
C E 1 0 0
C is co S
2 xG B E
LIN K RX
TX
TX
MM
NET
3