Cisco UCS B200 M4 Catatan Instalasi dan Layanan - Halaman 30
Jelajahi secara online atau unduh pdf Catatan Instalasi dan Layanan untuk Server Cisco UCS B200 M4. Cisco UCS B200 M4 46 halaman. For e5-2600 v4 series cpus
Juga untuk Cisco UCS B200 M4: Catatan Instalasi dan Layanan (30 halaman), Panduan Peningkatan (9 halaman), Panduan Servis (24 halaman)

Installing Memory
Step 2
Press gently on the top of the CPU carrier from the exterior side until it snaps into place.
Step 3
Close the socket latch.
Step 4
Hook the self-loading socket (SLS) lever .
Step 5
Hook the SLS lever
Step 6
Thermally bond the CPU and heat sink using the thermal grease provided.
Step 7
Replace the heat sink. The yellow CPU heat sink install guide pins that are attached to the motherboard must
align with the cutout on the heat sink to ensure proper installation of the heat sink.
Figure 14: Replacing the Heat Sink
Step 8
Tighten the four captive screws in the order shown.
Installing Memory
To install a DIMM into the blade server, follow these steps:
Procedure
Step 1
Open both DIMM connector latches.
Step 2
Press the DIMM into its slot evenly on both ends until it clicks into place.
DIMMs are keyed. If a gentle force is not sufficient, make sure the notch on the DIMM is correctly aligned.
Cisco UCS B200 M4 Blade Server Installation and Service Note
22
.
Servicing a Blade Server