Cisco UCS B420 M3 Catatan Instalasi dan Layanan - Halaman 17
Jelajahi secara online atau unduh pdf Catatan Instalasi dan Layanan untuk Server Cisco UCS B420 M3. Cisco UCS B420 M3 38 halaman. High performance blade server
Juga untuk Cisco UCS B420 M3: Panduan Peningkatan (8 halaman)
c) Lift the tool and CPU straight up.
Figure 11: Proper Alignment of CPU Pick and Place Tool
1
Alignment mark on the button/handle of the pick and
place tool
Installing a New CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
• The CPU is supported for that given server model. Refer to the Specification Sheet for this server to see the list of supported
CPUs. The Specification Sheets are available at this URL:
ucs-b-series-blade-servers/datasheet-listing.html
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in Cisco UCS Manager will recognize
and allow the new CPU.
The Pick-and-Place tools used in this procedure are required to prevent damage to the contact pins between
Caution
the motherboard and the CPU. Do not attempt this procedure without the required tools, which are included
with each CPU option kit. If you do not have the tool, you can order a spare.
2
Alignment mark on the socket
http://www.cisco.com/c/en/us/products/servers-unified-computing/
17