Cisco UCS C Series Pengaturan - Halaman 5
Jelajahi secara online atau unduh pdf Pengaturan untuk Server Cisco UCS C Series. Cisco UCS C Series 10 halaman. Security manager 4.3
Juga untuk Cisco UCS C Series: Tips Pemecahan Masalah (11 halaman), Panduan Peningkatan (11 halaman), Panduan Peningkatan (10 halaman), Panduan Memulai Cepat (12 halaman), Panduan Instalasi (19 halaman)
Power Up the KVM
Complete these steps in order to power up the server:
1.
Plug the power cord into the chassis.
Note:
♦
CIMC initializes system standby (Power Off mode).
♦
CIMC is active and can be controlled through GUI or CLI, if you know the IP address.
2.
Depress Front Panel Power:
♦
The Fans begins to spin up.
♦
Then POST sequence begins.
♦
At this point you can either boot up or begin the installation process.
♦
Note that for large memory, models can display a blank screen for several minutes.
♦
For C−250If you immediately depress the power switch, you interrupt the CIMC
initialization.