Ariston Type C Panduan Petunjuk Instalasi - Halaman 19

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Ketel uap Ariston Type C. Ariston Type C 44 halaman. Type c boilers
Juga untuk Ariston Type C: Panduan Petunjuk Instalasi (25 halaman), Panduan Petunjuk Instalasi (25 halaman), Panduan Petunjuk Instalasi (48 halaman), Petunjuk Pemasangan dan Servis (49 halaman)

Ariston Type C Panduan Petunjuk Instalasi
6.

MAINTENANCE

It is recommended that the following inspections be carried out on the boiler at
least once a year:
1 -
Check the seals for the water connections; replace any faulty seals.
2 -
Check the gas seals; replace any faulty gas seals.
3 -
Visual check of the entire unit.
4 -
Visual check of the combustion process or analysis of combustion by-products
(see section 4.5) and cleaning of the burner if needed.
5 -
If called for by point. 3, dismantling and cleaning of the combustion chamber.
6 -
If called for by point. 4, dismantling and cleaning of the burner jets.
7 -
Visual check of the primary heat exchanger:
- check for overheating in the blade assembly;
- clean the exhaust fan if needed.
8 -
Adjustment of the flow rate of the gas: flow rate for lighting, partial load and full load.
9 -
Check of the heating safety systems:
- safety device for maximum temperature (overheat thermostat);
- safety device for maximum pressure (safety valve).
10- Check of the gas safety systems:
- safety device for lack of gas or flame ionisation (detection electrode);
- safety device for gas cock.
11- Check of the electrical connection (make sure it complies with the instructions
in the manual).
12- General check of the combustion by-products of the discharge/ventilation system.
13- Check of the general performance of the unit.
19