Ariston Type C 설치 지침 매뉴얼 - 페이지 19

{카테고리_이름} Ariston Type C에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston Type C 44 페이지. Type c boilers
Ariston Type C에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (25 페이지), 설치 지침 매뉴얼 (25 페이지), 설치 지침 매뉴얼 (48 페이지), 설치 및 서비스 지침 (49 페이지)

Ariston Type C 설치 지침 매뉴얼
6.

MAINTENANCE

It is recommended that the following inspections be carried out on the boiler at
least once a year:
1 -
Check the seals for the water connections; replace any faulty seals.
2 -
Check the gas seals; replace any faulty gas seals.
3 -
Visual check of the entire unit.
4 -
Visual check of the combustion process or analysis of combustion by-products
(see section 4.5) and cleaning of the burner if needed.
5 -
If called for by point. 3, dismantling and cleaning of the combustion chamber.
6 -
If called for by point. 4, dismantling and cleaning of the burner jets.
7 -
Visual check of the primary heat exchanger:
- check for overheating in the blade assembly;
- clean the exhaust fan if needed.
8 -
Adjustment of the flow rate of the gas: flow rate for lighting, partial load and full load.
9 -
Check of the heating safety systems:
- safety device for maximum temperature (overheat thermostat);
- safety device for maximum pressure (safety valve).
10- Check of the gas safety systems:
- safety device for lack of gas or flame ionisation (detection electrode);
- safety device for gas cock.
11- Check of the electrical connection (make sure it complies with the instructions
in the manual).
12- General check of the combustion by-products of the discharge/ventilation system.
13- Check of the general performance of the unit.
19