Armstrong Rada 320D Panduan Instalasi dan Pemeliharaan - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Instalasi dan Pemeliharaan untuk Unit Kontrol Armstrong Rada 320D. Armstrong Rada 320D 20 halaman. Water temperature controls groups of fixtures - thermostatic
Juga untuk Armstrong Rada 320D: Panduan Instalasi dan Pemeliharaan (12 halaman), Panduan Instalasi dan Pemeliharaan (20 halaman)

Armstrong Rada 320D Panduan Instalasi dan Pemeliharaan
Step 5
Model 320 must be installed in a standard HOT-LEFT/COLD-RIGHT inlet supply configuration.
There are red (hot) and blue (cold) markings on each valve.
The inlet supplies must always match the corresponding inlet ports on the valve.
Step 6
a. Fully tighten all of the pipes using an adjustable spanner.
Caution! Use a soft cloth to cover the plating from
damage while tigtening with spanner.
Step 7
a. Turn on the water supply and ensure that there are
no leaks.
11