Aerial Assault Wakeboard Tower Panduan Instalasi - Halaman 11
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Peralatan Perahu Aerial Assault Wakeboard Tower. Aerial Assault Wakeboard Tower 13 halaman.
STEP 14
STEP 15
STEP 16
11
Drilling the top section.
The X measurement is a great way to make sure that your
tow point is in the center of your boat. To do this, measure
from the tow point to your rear foot, then to your other
foot. Cover your boat with an old sheet or old cover to
make removing the metal shavings easy. Someone should
hold the top section while you drill.
Using the pre-drilled holes in the top section tube, mark the
drilling positions on the front leg tubes.
Before making your marks, check to ensure that the tow
point is aligned correctly and positioned vertically. The tow
point should also be positioned on the rear of the top sec-
tion tube so that the logo plate is facing towards the bow
of the boat.
We then recomend drilling the holes with a smaller drill bit
(smaller than the 27/64" drill bit) to make a pilot hole.
Following the pilot holes you just drilled, use a 27/64" drill bit
to create the clearance hole for the joining bolts.
As each hole is drilled we recommend inserting each bolt
so that it keeps the parts aligned while drilling the next
hole.
GUIDE#: pwb-ASSAULT-004