DLab OS20-Pro Panduan Servis - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Servis untuk Peralatan Laboratorium DLab OS20-Pro. DLab OS20-Pro 12 halaman. Overhead stirrers
2.3 Circuit Connections (OS20-Pro&OS40-Pro)
Step 1:
Circuit connections are performed
at the red circle. Before close the
upper guard and install instrument,
please carefully check the cables
and make sure they are correctly
connected.
Power Interface
Power switch Interface
Ribbon Cable Interface of LCD PCB
Photosensor interface
Motor interface
6