DLab OS20-Pro 서비스 매뉴얼 - 페이지 8

{카테고리_이름} DLab OS20-Pro에 대한 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DLab OS20-Pro 12 페이지. Overhead stirrers

DLab OS20-Pro 서비스 매뉴얼
2.3 Circuit Connections (OS20-Pro&OS40-Pro)
Step 1:
Circuit connections are performed
at the red circle. Before close the
upper guard and install instrument,
please carefully check the cables
and make sure they are correctly
connected.
Power Interface
Power switch Interface
Ribbon Cable Interface of LCD PCB
Photosensor interface
Motor interface
6