AERMEC ANK Panduan Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Pendingin AERMEC ANK. AERMEC ANK 14 halaman.
2.2ELECTRICAL CONNECTIONS
The ANK heat pumps are completely wired at the
factory a nd only require connection to the electrical
mains, downstream from a unit switch, according
to that envisioned by the Standards in force on
this subject in the country of installation.
It s also advised to check the following:
The electrical mains features are suitable
For the absorption values indicated in the
electrical data table in technical manual. Also taking into
consideration any other machines operating at the same time.
The unit is only powered when installation has been
completed (hydraulic and electric).
Respect the connection
and ground wires.
The power supply line must have a relevant protection
mounted upstream against short circuits and
dispersions to earth, which isolates the system with
Respect to other utilities.
The voltage must be within a tolerance of ±10% of the
nominal power supply voltage of the machine (for
unbalanced three‐phase unit max 3% between the
phases). Whenever these parameters are not
respected, contact the electric energy public body. For
electric connections, use the cables with double
isolation according to the Standards in force on this
subject in the differentcountries.
The use of an omnipolar magnet circuit breaker switch
is mandatory, in compliance with the IEC‐EN Standards
(contact opening at least 3 mm), with suitable cutoff
power and
differential
of the electric data table shown below, installed as near
as possible to the appliance.
It is mandatory to make an effective earth connection.
The manufacturer cannot be considered responsible for
any damage caused by the lack of or ineffective
appliance earth connection.For units with three‐phase
power supply, check the correct connection of the
phases.
5
indications of the phase,
protection
on the basis
2.2.1 CABLE
The cable section shown in the table are recommended for maxi‐
mum lengths of 50m. For longer lengths or different cable laying, it
is up to the designer to calculate the appropriate line switch, the
power supply line as well as the connection to the earth wire and
connection cables
depending on:
length
type of cable
absorption of the unit and the physical location
ambient temperature.
ATTENTION:
Check the tightening of all power wire clamps on commissioning
and after 30 days from start‐up. Subsequently, check the tightening
of all the power clamps every six months. Loose terminals can cause
overheating of the cables and components.
2.2.2 CONNECTING POWER SUPPLY
Before connecting the unit to the power supply mains , en‐
sure that the switch is off
Open the front panel
Use the holes at the bottom on the framework for the
main electric power supply cable and for the cables of the
other external connections under the responsibility of the
installer.
It is forbidden to access with electric cables in positions not
specifically envisioned in this manual.
Avoid direct contact with not insulated copper piping and
with compressor.
Identify the clamps for the electric connection, always refer
to the electric layout supplied with the unit.
For the functional connection of the unit bring a power
supply cable to the electric control board inside the unit and
connect to the U‐N and PE clamps respecting (U) phase, (N)
neutral, (PE) earth in case of single‐phase power supply
(220V‐1~60Hz),
Re‐position the inspection panels
Ensure that all protections removed for the electric connec‐
tion have been restored before electrically powering the
unit.
Position the main system switch (external to the appliance)
at "ON".