AERMEC ANK 설치 매뉴얼 - 페이지 5

{카테고리_이름} AERMEC ANK에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AERMEC ANK 14 페이지.

AERMEC ANK 설치 매뉴얼

2.2ELECTRICAL CONNECTIONS

 The ANK heat pumps are completely wired at the 
factory  a nd only require connection to the electrical 
mains, downstream from a unit switch, according 
to that envisioned by the Standards in force on 
this subject in the country of installation. 
 
It s also advised to check the following: 

The electrical mains features are suitable 
For the absorption values indicated in the   
electrical data table in technical manual. Also taking into 
consideration any other machines operating at the same time. 

The unit is only powered when installation has been 
completed (hydraulic and electric). 

Respect the  connection 
and ground wires. 

The power supply line must have a relevant protection 
mounted upstream against short circuits and 
dispersions to earth, which isolates the system with 
Respect to other utilities. 

The voltage must be within a tolerance of ±10% of the 
nominal power supply voltage of the machine (for 
unbalanced three‐phase unit max 3% between the 
phases). Whenever  these  parameters are not 
respected, contact the electric energy public body. For 
electric connections,   use the cables with double 
isolation according to the Standards in force on this 
subject in the differentcountries. 

The use of an omnipolar magnet circuit breaker switch 
is mandatory, in compliance with the IEC‐EN Standards 
(contact opening at least 3 mm), with suitable cutoff 
power  and 
differential 
of the electric data table shown below, installed as near 
as possible to the appliance. 

It is mandatory to make an effective earth connection. 
The manufacturer cannot be considered responsible for 
any damage caused by the lack of or ineffective 
appliance earth connection.For units with three‐phase 
power supply, check  the correct connection of the 
phases. 
 
5  
indications of the phase, 
protection 
on the basis 
2.2.1 CABLE
The cable section shown in the    table are recommended for maxi‐
mum lengths of 50m. For longer lengths or different cable laying, it 
is up to the designer to calculate the appropriate line switch, the 
power supply line as well as the connection to  the  earth wire and 
connection cables 
depending on: 

length 

type of cable 

absorption of the unit and the physical location 

ambient temperature. 
ATTENTION:
Check the tightening of all power wire clamps on commissioning 
and after 30 days from start‐up. Subsequently, check the tightening 
of all the power clamps every six months. Loose terminals can cause 
overheating of the cables and components. 

2.2.2 CONNECTING POWER SUPPLY


Before connecting the unit to the power supply mains , en‐
sure that the switch is off 

Open the front panel 

Use the  holes  at the bottom on the framework for the 
main electric power supply cable and for the cables of the 
other external connections under the  responsibility  of the 
installer. 

It is forbidden to access with electric cables in positions not 
specifically envisioned  in this manual. 

Avoid direct contact with not insulated copper piping and 
with compressor. 

Identify    the clamps for the electric connection, always refer 
to the electric layout supplied with the unit. 

For the functional connection  of the unit bring a power 
supply cable to the electric control board inside the unit and 
connect to the U‐N and PE clamps respecting (U) phase, (N) 
neutral, (PE) earth in case of single‐phase power supply 
(220V‐1~60Hz), 

Re‐position the  inspection panels 

Ensure  that all protections removed for the electric connec‐
tion have been restored before electrically powering the 
unit. 

Position the main system  switch (external to the appliance) 
at "ON".