Akron 3579 Petunjuk Instalasi - Halaman 4
Jelajahi secara online atau unduh pdf Petunjuk Instalasi untuk Alat Ukur Akron 3579. Akron 3579 5 halaman. Stop bracket service kit
Figure 5: Lower Stop against Inlet Elbow
9. Rotate the elevation joint until it just contacts the bumpers (#204). This contact should occur a few degrees before
vertical. Continue rotating until elevation joint is vertical. All 4 bumpers should be engaged and partially compressed.
Refer to Figure 6.
10. If steps 8&9 are successful and monitor matches Figure 6 then the installation is complete. If monitor does not
match Figure 8 remove the bracket and return to Step 1 to repeat installation. However, it is recommended to
return the unit to Akron Brass for repair and evaluation if the initial installation is not successful.
Figure 6: Upper Stop against Bumpers
203
Page 4
2