Inlet Pipe
Pedestal Pumps
Models: PED Series
Installation
Discharge piping can be
PVC, polypipe or
galvanized steel.
6
CAUTION:
Check local codes before installing
pump.
STEP 1:
Pump must be installed in a suitable
gas tight, properly vented basin which
is at least 24" deep and at least 14"
wide for pumps fitted with vertical
on/off switches.
STEP 2:
Pump must be placed on a hard sur-
face in a sump that has been cleared
of all debris. Never place the pump
on clay, earth or gravel surfaces and it
is suggested the pump be placed on
two bricks approximately 2" apart.
STEP 3:
Connect the discharge pipe, fittings
and check valve to the discharge port
of the pump. It is recommended that
the discharge pipe diameter be equal
to or larger than the discharge size of
the pump.