Amerisolar Wolfram-BAT-10.24 Manuale di installazione - Pagina 11

Sfoglia online o scarica il pdf Manuale di installazione per Camera Accessories Amerisolar Wolfram-BAT-10.24. Amerisolar Wolfram-BAT-10.24 20.

Worldwide Energy and Manufacturing USA Co., Limited
Battery self-discharge rate
Factory SOC state
Insulation resistance
Weight
Dimensions (width * depth
*height)
Installation location

4. Installation

4.1 Tools and Safety Devices

The following tools are required to install this product. Installation tool confirmation.
Screwdriver
Note:
•Use properly insulated tools to prevent accidental electric shock or short circuit;
•If there is no insulated tool, please use electrical tape to cover the entire bare metal surface
of the available tool (except the tip). When handling the battery, it is recommended to wear
the following safety equipment.
Insulated gloves
When installing, moving and placing the battery system, please always follow the instructions
in the manual. Improper operation may cause minor injuries, severe injuries or contusions.

4.2 Structural Installation

Step 1: Install the backplane
≤5%(25℃,50%SOC)
30-40%
>200MΩ
170kg
700*230*1270mm(With feet height 1340mm)
Indoor/outdoor
Goggles
9
Socket wrench
Safety shoes