Follett Horizon Elite HCD1810NBT Manuale di istruzioni per l'installazione - Pagina 10
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Fabbricatore di ghiaccio Follett Horizon Elite HCD1810NBT. Follett Horizon Elite HCD1810NBT 13.
Anche per Follett Horizon Elite HCD1810NBT: Manuale di avvio rapido (8 pagine), Manuale (8 pagine)
Connect docking assembly to ice machine.
7.1
Ice transport tube installation
➋
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
➊
• Evacuate line set.
• Connect self-sealing liquid and suction
➊
line fittings
10
➊
➊
➋
Internal connections
7.2
Water line
➊
Mount water
solenoid
• Mount water solenoid to inside rear of
docking assembly using one screw
• Insert potable water line into valve
• Insert into push-in connection of water
solenoid
➌
7.4
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
remote condensing
7
➋
➌
➊
➋
BIN • TOP-MOUNT