Follett Horizon Elite HCD1810NBT Kurulum Talimatları Kılavuzu - Sayfa 10

Buz Yapıcı Follett Horizon Elite HCD1810NBT için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett Horizon Elite HCD1810NBT 13 sayfaları.
Ayrıca Follett Horizon Elite HCD1810NBT için: Hızlı Başlangıç Kılavuzu (8 sayfalar), Manuel (8 sayfalar)

Follett Horizon Elite HCD1810NBT Kurulum Talimatları Kılavuzu
Connect docking assembly to ice machine.
7.1
Ice transport tube installation
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
10

Internal connections

7.2
Water line
Mount water
solenoid
• Mount water solenoid to inside rear of
docking assembly using one screw
• Insert potable water line into valve
• Insert into push-in connection of water
solenoid
7.4
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
remote condensing
7
BIN • TOP-MOUNT