ADVANCED Network Devices IPSIGNL-RWB Istruzioni per l'installazione
Sfoglia online o scarica il pdf Istruzioni per l'installazione per Monitor ADVANCED Network Devices IPSIGNL-RWB. ADVANCED Network Devices IPSIGNL-RWB 2. Clock
Installation Instructions
The following instructions should be followed for stainless steel clock
installations.
1. A ferrite is included if there is concern over line performance. Wrap Cat 5 cable around
ferrite once and clamp shut.
2. Remove Phillips head screws from both sides of the device. (4 total)
3. Separate stainless steel baffle from wall mount bracket.
4. Mount bracket to wall using appropriate mounting hardware; see included template for
detailed instructions or use wall bracket as a guide. Use a minimum of 4 mounting holes.
5. Connect a network cable (Cat 5 or better) to the internal circuit board and connect any
additional wiring to the stainless steel unit as needed.
6. Re-insert stainless steel baffle into wall mount bracket.
7. Replace 4 screws into sides of the device.
8. Connect the other end of the network cable to a PoE (Power over Ethernet) network switch,
or a PoE injector, on a network with a DHCP server. Some equipment options are listed on
the support site: www.anetdsupport.com/peripherals.
9. If properly installed, the unit should boot and show the time within 30 seconds. See Boot
Sequence on other page for details.
10. Consult the
Clockwise User manual
software guide for further instructions on sending audio and text to the device.
Clock Installation Instructions
(IPCSS-RWB/IPCSL-RWB/IPSIGNL-RWB)
(see www.anetdsupport.com/documents) or 3
Typical model shown
For additional support, visit
www.anetdsupport.com
Version 1.5
4/20/2015
rd
party