AddEnergie SmartTWO Manuale di avvio rapido - Pagina 3
Sfoglia online o scarica il pdf Manuale di avvio rapido per Caricabatterie AddEnergie SmartTWO. AddEnergie SmartTWO 4.
Anche per AddEnergie SmartTWO: Manuale di installazione (20 pagine)
Pedestal Installation
Communication Gateway
Install the communication gateway prior to the commissioning of the
station.
• The gateway must be installed at less than 50 meters
(160 ft.) in line of sight from the stations.
• An outdoor installation is recommended in a PVC box.
• It is recommended to feed the PVC box from underneath.
• When completed, the PVC box must be waterproof.
• Note : Never use a GFCI outlet (ground fault circuit
interrupter outlet) to power the communication gateway.
ZigBee Antenna
Cellular
Antenna
Commissionning
Contact us when the communication gateway is installed to validate
the signal levels and activate commissioning or for any other ques-
tions:
1 877-505-2674 #203
Note : The communication gateway is the property of
AddÉnergie. Fees will be charged if the gateway is damaged or lost.
Power Supply