Station Head and Connertor Installation
Installation of the charging station head on its base
1. Unscrew the charging port horlder
2. Remove the charging port and cable assembly :
2.1. Disconnect the three positions connector
2
black connector
.
3
2
3
2.2. Unscrew the two brackets
2
3
3. Slide the head into the base.
1
1
To facilitate the insertion, spray a fine coat of
silicon based lubricant on the rubber gasket
1
residing on the back of the base
Installation of the charging coupling connector
2
3
1. Screw the bracket back into place
2. Connect the three positions connector
1
be on the right) and the small black connector
3. Screw the charging port holder back into place
2
3
2
3
Make sure the bottom of the charging port holder does not interfere
with the base.
1
1
*
WARNING: Never use a power tool to install the security
screws, and never apply a torque of more than 18 Nm (160
pound-inches) when tightening them.
.
4
2
and the small
2
3
3
.
1
2
3
1
.
5
2
3
*
.
1
(green connection should
2
2
3
.
3
*
.
4
1
1
5
1
Important :
- Do not slide the head down with excessive force.
If the head doesn't slide down into position easily,
gentle shake the base of the charger head while
guiding it into the base.
- Be careful not to damage the black plastic connectors
on the bottom of the charger head on the top of the
base.
- Once fully inserted, the spacing between the head
and the base should be from 0 à 3mm.