Elsner KNX L Specifiche tecniche e istruzioni per l'installazione - Pagina 7
Sfoglia online o scarica il pdf Specifiche tecniche e istruzioni per l'installazione per Accessories Elsner KNX L. Elsner KNX L 8. Brightness sensor
2.3.3. Preparing the sensor
Unsnap cover and
remove upwards
Fig. 7
1
Cover Snaps
2
Bottom part of housing
The sensor cover snaps in on the left and right along the bottom edge (see Fig.). Re-
move the cover.
Push the bus connection cable through the rubber seal on the bottom of the sensor and
connect bus +/- to the provided clamps.
2.3.4. PCB layout
2.3.5. Mounting the sensor
Close the housing by putting the cover back over the bottom part. The cover must snap
in on the left and right with a definite "click".
KNX L brightness sensor • Date of issue: 05.11.2010 • Technical changes reserved. Errors reserved.
7
1
2
3
Installation and commissioning
Fig. 8
1
Slot for KNX clamp +/-
2
Programming LED
3
Programming pushbutton for
the teach-in of the device
1
2