6K Products 30G24 Manuale di funzionamento e parti di ricambio - Pagina 5

Sfoglia online o scarica il pdf Manuale di funzionamento e parti di ricambio per Apparecchiature industriali 6K Products 30G24. 6K Products 30G24 17. Connect and cut hydraulic chain

After assembling the components as shown in figure 1, position the saw bar square to the log, at the correct height
with clearance between the bar guard and the side of the largest log and weld down solidly (Fig. 4).
Fig. 4

Hydraulic Connections

The hydraulic requirements to operate the saw are 29 to 35 gallons per minute at 2000 psi from a directional control
valve that has port A and B blocked in the neutral position. These pictures are examples of valve spool that will
work.
The hydraulic valve can be manual or electric control. Figure 5 shows hose
connections for correct operation.
Fig. 5
5