Great Lakes GL300E-2432 Manuale di istruzioni per l'installazione - Pagina 4
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Involucro Great Lakes GL300E-2432. Great Lakes GL300E-2432 13. Equipment cabinet/rack
INSTALLATION
Receiving, Unpacking, and Removing the E cabinet from the Pallet
Inspect and report any damage before receiving. Unpack the cabinet
by carefully removing the corrugated carton and corners. Avoid
damaging the cabinet when removing packaging.
WARNING: Only trained service personnel should be used to remove
the cabinet from the pallet. Also, be sure you have a sufficient number
of service personnel. Do not attempt to move cabinets by yourself.
WARNING: Be careful when moving cabinets before installation.
Sudden stops and starts, excessive force, obstructed routes, and
uneven floor surfaces may cause the cabinet to topple over.
Loading Equipment
WARNING: Only install equipment after the E cabinet has been
properly secured. Do not move the E cabinet assembly while loaded.
Once in place at the desired/intended location, deploy the leveling feet
for maximum stability.
Rated or maximum load capacity for the GL300E is 300 lbs. and the
maximum load capacity for the GL480E and GL600E is 600 lbs.
To maintain a uniform distribution of the mechanical load in the
E cabinet, load the heaviest equipment first, at the bottom of the
E cabinet and load the lighter units at the top.
4