Emerson 781 Manuale di riferimento - Pagina 6

Sfoglia online o scarica il pdf Manuale di riferimento per Apparecchiature industriali Emerson 781. Emerson 781 13. Smart wireless field link

Emerson 781 Manuale di riferimento
Reference Manual 
00809‐0200‐xxxx, Rev AA 
April 2010 
 
Grounding
 
The Field Link enclosure should always be grounded in accordance with national and local electrical codes.  The 
most effective grounding method is a direct connection to earth ground with minimal impedance.  Ground the 
Field Link by connecting the external ground lug to earth ground.  The connection should be 1 Ω or less. 
STEP 2: Verify Operation
Add local display screens here. 
Power‐Up Sequence 
Upon applying power to the Field Link the LCD meter will activate and display a series of startup screen.  The 
following screens are displayed during startup. 
1. Startup Screen 1 – All segments on 
2. Startup Screen 2 – Device Identification 
3. Startup Screen 3 – Tag 
4. Startup Screen 4 – Status 
Normal Operation
 
After the initial startup screens the Field Link will cycle through several periodic screens.   
1. Electronics Temperature Screen 
2. Percent Range Screen 
3. Wired Interface Usage 
4. Radio Interface Usage 
The field link will continue to rotate through each periodic screen through the course of normal 
operation.  If any diagnostic or fault condition occurs, a corresponding diagnostics screen will appear.